Beineu-Shymkent Gas Pipeline LLP announces results of the open tender for development of the basic design “Construction of gas metering unit at the bridge gas pipeline between Beineu-Bozoy-Shymkent MGP and Bukhara-Ural MGP” carried out on 11 hour 00 minutes on 18th of June 2021 at Almaty, Abylay khan ave., 53 the
Consortium, consisting of “GasServStroi” LLP and “Contur” LLP with the following address of the leader of the consortium: Republic of Kazakhstan, А15Е2Р9, Almaty city, Al-Farabi ave. 17/1, PFC Nurly-Tau, block 5B, 14th floor has been recognized as the winner with amount of: 132 868 000, 00 (one hundred thirty-two million eight hundred sixty-eight thousand) KZT, excluding VAT and 148 812 160, 00 (one hundred forty-eight million eight hundred and twelve thousand one hundred sixty) KZT, including VAT.