Announcement of results of the open tender for development of the Basic Design “Construction of gas metering unit at the bridge gas pipeline between Beineu-Bozoy-Shymkent MGP and Bukhara-Ural MGP”

Beineu-Shymkent Gas Pipeline LLP announces that the open tender for development of the Basic Design “Construction of gas metering unit at the bridge gas pipeline between Beineu-Bozoy-Shymkent MGP and Bukhara-Ural MGP” carried out on 26th of November 2020, at 12 hour 00 minutes at Almaty, Abylay khan ave., 53 recognized as invalid.